Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the translatepress-multilingual domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kanzasar/public_html/wp-includes/functions.php on line 6114
Réalisations – KANZA SARL

Achievements

MT / BT fourniture de bâtiments

Underground and overhead network

Construction of cabin stations

Public ligthning

Renewable energy

Others

A few projects

Santa Lucia #1
MV / LV power supply by transformer installation H61 160KVA
Douala, Cité CICAM
Santa Lucia #1
MV / LV power supply by transformer installation H61 160KVA
Douala, Cité CICAM
ERTA
MT/BT network movement
Douala, Mobil Guiness
Wanda SAS
Installation of H59 630KVA transformer
Douala, Bonabéri
Santa Lucia #2
Moving MT/BT networks and MT/BT power supply
Yaounde, Essos
Mabou David
MT/BT power supply by installing EcoBloc 250KVA station
Douala, Bonapriso
Mumbe Gilbert
Power increase by installing H59 250KVA transformer on chair
Douala, Ndogpassi
Kweuke Leony Leonard
MT/BT power supply by installing H61 160KVA transformer
Douala, Makepe
Puwo Tameko Joseph
MT/BT power supply by installing H61 160KVA transformer
Douala, Sodiko
ENEO
400KVA cabin post rehabilitation
Douala, Bonapriso
en_GB
× Chat with us