Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the translatepress-multilingual domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kanzasar/public_html/wp-includes/functions.php on line 6114
Réalisations – KANZA SARL

Réalisations

MT / BT fourniture de bâtiments

Réseau souterrain et aérien

Construction de postes cabine

Éclairage public

Énergies renouvelables

Autres

Quelques projets

Santa Lucia #1
MV / LV power supply by transformer installation H61 160KVA
Douala, Cité CICAM
Santa Lucia #1
MV / LV power supply by transformer installation H61 160KVA
Douala, Cité CICAM
ERTA
Déplacement réseaux MT/BT
Douala, Mobil Guiness
Wanda SAS
Pose transformateur H59 630KVA
Douala, Bonabéri
Santa Lucia #2
Déplacement réseaux MT/BT et alimentation MT/BT
Yaounde, Essos
Mabou David
Alimentation MT/BT par pose poste EcoBloc 250KVA
Douala, Bonapriso
Mumbe Gilbert
Augmentation de puissance par pose transformateur H59 250KVA sur chaise
Douala, Ndogpassi
Kweuke Leony Leonard
Alimentation MT/BT par pose transformateur H61 160KVA
Douala, Makepe
Puwo Tameko Joseph
Alimentation MT/BT par pose transformateur H61 160KVA
Douala, Sodiko
ENEO
Réhabilitation poste cabine 400KVA
Douala, Bonapriso
fr_FR
× Chat with us